
Polyurethane Ultra-Wear Resistant Coating







Details
Attention
1. After completion, allow the floor to cure for 7 days before putting into use. Protect it from water and chemical spills.
2. Move items carefully and avoid dragging or pulling to prevent scratches.
3. Do not bring coarse sand, grit or mud onto the floor during daily use.
4. If the floor is contaminated with chemical solutions, wipe it off promptly with a cloth. For routine cleaning, use clean water or a mild detergent.
5. In areas where oil may leak or seep from machinery corners, clean regularly with sawdust to absorb it.
6. Minor wear or scratches can be repaired locally; if large areas are damaged, re-apply the topcoat over the entire surface.
7. If conditions allow, apply a coat of wax before use to protect the floor and extend its service life.
