1/1
Find
Aegean Cream
Reference Price:USD/㎡
Brand:YUE HENG DA
Material No.:EBOWL61O
Supplier: CONTACT US
Material ID:
Add to Project
Material Consultation
Overview
Product Reports
Documents
Specifications
Product Model:Aegean rice white
Country of Origin:Guangdong Province, China
Overall Thickness:18mm,20mm
Pattern:Crystal Grain
Fire Rating:A1
Hardness:4.5
Indoor/Outdoor:Indoor Use
Size(mm):2430*1630、2430*1830、2730*1830、3030*1630、3230*1630
Water Absorption:0.01%
Color:Brown Series
Finish:Polished
Brand Name:YUE HENG DA
Series Name:Artificial Onyx
Category:Stone/Engineered Stone
Customizable:Yes
Overview
Product Details/cases/detailed Images

Product Details/cases/detailed Images

Product Details/cases/detailed Images

Case Diagram
Attention
Engineered Stone Flooring Installation
I. General requirements for engineered stone floor installation:
1. Engineered stone flooring should be laid in an inside-to-outside order, starting from the side farthest from the doorway and gradually working back toward the door.
2. Engineered stone borderlines and baseboards should align with the floor panel joints.
3. Ensure rain shelter and anti-ponding measures near doors and windows; water, electricity, tools, and safety protection must be in place.
II. Thin-bed (hard substrate) installation shall comply with the following:
1. Construction must be carried out on a fully cured rigid substrate. Concrete subfloors require at least 28 days of curing, and cement mortar screeds require at least 14 days before tiling can begin.
2. Use a two-component cementitious adhesive as the bonding material.
3. The rigid substrate shall meet the following requirements:
1) Flatness deviation shall not exceed 3 mm over 2 m. If the flatness does not meet the requirement, treat the surface with polymer-modified cement mortar.
2) The working surface must be free of standing water; substrate moisture content should preferably not exceed 8%.
3) The substrate surface must be sound, clean, and free of grease, paint, dust, and other contaminants that may impair adhesion.
4) Substrate strength shall meet the following:
﹣ Concrete subfloor strength grade not less than C20.
﹣ Levelling mortar strength grade not less than M15, mortar thickness not less than 20 mm, cement-to-sand ratio around 1:2.
4. Installation sequence shall follow the illustrated process flow.
5. Key construction points:
1) Mechanically roughen the substrate surface.
2) Snap cross control lines on the substrate according to the shop drawings, and extend them to the bottom of the walls.
3) Prepare the adhesive following the manufacturer’s instructions; mix only the amount that can be used within the pot life at the prevailing working speed.
4) Apply a flat layer of the two-component cementitious adhesive on the substrate using the straight edge of a 10 mm × 10 mm notched trowel. Then comb the adhesive with the notched side, holding the trowel at a 45° angle to the surface, to achieve full, unbroken ridges. Adhesive thickness should be controlled at 3–4 mm.
5) Clean dust, grease, and other contaminants from the back of the engineered stone slab with a dry cloth or brush. Apply a flat layer of the same two-component adhesive onto the slab back using the straight edge of a 12 mm × 12 mm notched trowel. Comb the adhesive with the notched side at a 45° angle to create continuous ridges, thickness 3–4 mm. Ensure edges and corners are fully coated and chamfer the adhesive at the perimeter.
6) Place the prepared slab steadily into position, ensuring the ridges on the slab back run parallel to those on the substrate so that the grooves fit onto the ridges. Press and wiggle the slab firmly, adjusting for evenness.
7) Maintain the designed joint width between slabs during laying; use joint clips to hold the spacing. Provide movement joints (expansion joints) as specified, cutting them down to the substrate.
8) After every 30 m² laid, lightly tap each slab to check for hollow sounds. If any hollows are detected, lift and re-lay immediately.
9) Grouting is best performed 28 days after installation, or after the adhesive has fully cured and dried. Grouting shall comply with:
① Clean joints, then fill with a reactive resin grout that matches the color of the engineered stone. Apply uniformly and fully to ensure a strong bond.
② Clean out the movement joints down to the substrate. Before floor surface treatment, fill them with neutral-cure silicone sealant; after surface treatment, fill with U-channel buffers or similar.
III. Thick-bed (soft mortar) installation shall comply with the following:
1. After the on-site mortar screed is laid, use a one-component moisture-curing polyurethane adhesive following the illustrated process.
2. Key construction points:
1) Remove laitance, dried mortar droppings, oil, coatings, sealers and other bond-breakers from the concrete subfloor; chip off any protrusions.
2) Mark the finished floor level line on the wall based on the vertical datum. Except for wet areas, the entire floor on the same level should use a consistent elevation.
3) Lay the levelling mortar as follows:
﹣ Brush a neat cement slurry (water-cement ratio 0.4–0.5) onto the concrete subfloor in small areas, followed immediately by the mortar.
﹣ Spread the levelling mortar to a thickness such that, when the stone slab is placed, the slab surface will be 3–4 mm above the finished floor line. Use ordinary Portland cement ≥ 32.5 grade, medium or coarse sand with silt content < 3% and free of organic matter; cement-to-sand ratio about 1:2, mixed with water to a “damp earth” consistency (holds shape when squeezed, crumbles when dropped). Level with a straightedge, then pat and compact with a trowel.
4) Snap cross control lines. Trial-lay the stone slab on the fresh mortar bed, pressing and vibrating it fully. Check color, size, and edge evenness; swap slabs if necessary.
5) Apply adhesive as follows:
﹣ Prepare the one-component moisture-curing polyurethane adhesive per instructions.
﹣ Lift the trial-laid slab and apply a small amount of adhesive to the mortar at the slab corners. Clean the slab back with a dry cloth or brush, then apply adhesive using a 6 mm × 6 mm notched trowel, thickness 2–3 mm. Fully coat edges and chamfer.
6) Place the glued slab onto the mortar bed, press, wiggle, and tap to consolidate and level; avoid heavy, rough striking.
7) Maintain the designed joints between slabs using clips; provide movement joints cut to the substrate.
8) After every 30 m² laid, tap-check for hollowness and re-lay if necessary.
9) Grouting is to be carried out preferably 28 days post-installation or when adhesive is cured. Same grouting procedure as for thin-bed method (reactive resin grout; movement joints filled with neutral silicone then buffer).
IV. After floor installation is complete, immediately cover with a breathable protective layer such as gypsum board, fiberboard, rigid paperboard, or composite wood board to prevent scratching, staining, and vibration during subsequent works. Do not walk on the floor for 3 days after laying; for 7 days, avoid moving goods, setting up ladders, or bringing in heavy equipment.