Pearl White

Reference Price:USD/㎡
Brand:YUE HENG DA
Material No.:EG6AI95M
Supplier: CONTACT USCONTACT US
Material ID:
Add to Project
Material Consultation
Overview
Product Reports
Documents
Specifications
Product Model:Pearl White
Country of Origin:Guangdong Province, China
Hardness Factor:4.5
Finish:Polished,Matte,Customizable
Fire Rating:A1
Pattern:Crystal Grain
Indoor & Outdoor:Indoor Wall,Indoor Floor,Indoor Dry Area,Countertop,Indoor Wet Area
Organic/Inorganic:Organic
Overall Thickness:18,20,Customizable
Water Absorption:0.01
Size(mm):2430*1630、2430*1830、2730*1830、3030*1630、3230*1630
Color:
White Series
Brand Name:YUE HENG DA
Series Name:Artificial Onyx
Category:Stone/Engineered Stone/Synthetic Stone
Customizable:Yes
Overview
Structural Diagram
Structural DiagramMaterial ImageMaterial Image
Case Diagram
Case DiagramMaterial ImageMaterial Image

Attention

Artificial Stone Floor Installation I. General requirements for artificial stone flooring: 1. Lay artificial stone flooring from inside to outside, starting from the side farthest from the door and gradually working back to the door. 2. Border tiles and skirting should align with the floor panel joints where possible. 3. Near doors and windows, provide rain protection and prevent water accumulation; ensure water, electricity, tools, and safety measures are in place. II. Thin‑bed hard substrate method: 1. Work on a fully cured hard substrate: concrete subfloor must cure for over 28 days, cement mortar layer over 14 days before installation. 2. Use a two‑component cementitious adhesive. 3. Hard substrate requirements: a. Flatness deviation ≤3mm/2m; if not met, treat with polymer cement mortar. b. No standing water; substrate moisture content ≤8%. c. Substrate surface must be solid, clean, free of grease, paint, dust, etc. that affect bonding. d. Substrate strength: - Concrete subfloor strength grade ≥C20; - Screed mortar strength grade ≥M15, thickness ≥20mm, cement‑sand ratio about 1:2. 4. Construction process flow (see illustration). 5. Key construction points: a. Roughen the substrate surface. b. Snap cross control lines on the substrate according to drawings, and extend them to the lower part of the wall. c. Mix adhesive according to the manufacturer’s instructions; only prepare the amount that can be used within its pot life. d. On the substrate, use the straight edge of a 10mm×10mm notched trowel to apply a flat layer of adhesive, then use the notched edge held at 45° to comb out full, uninterrupted ridges, 3–4mm thick. e. Clean the back of the artificial stone panel with a dry cloth or brush to remove dust, grease, rust, etc. On the back of the panel, use the straight edge of a 12mm×12mm notched trowel to apply a flat layer of adhesive, then comb out full, uninterrupted ridges at 45°, 3–4mm thick. Fill edges and corners with adhesive and bevel them. f. Place the panel so that the notched ridges on the back are parallel to those on the substrate, with valleys mating peaks. Press firmly and adjust flatness. g. Leave joints between panels as specified; use joint spacers. Also provide movement joints as required, cutting down to the substrate. h. After every 30m² laid, tap gently to check for hollow sound; re‑lay immediately if any hollow area is found. i. Grouting should be done after 28 days or after the adhesive has fully cured. Grouting requirements: - After cleaning the joints, fill with a reactive resin grout matching the stone colour; the grout shall be uniform, full, and firmly bonded. - Clean movement joints down to the substrate, fill with neutral weatherproof silicone sealant before floor treatment; after floor treatment, fill with U‑profile buffer. III. Thick‑bed soft substrate method: 1. After screeding with site‑mixed mortar, use a one‑component moisture‑curing polyurethane adhesive following the construction flow chart. 2. Key construction points: a. Clean the concrete subfloor: remove laitance, dropped mortar, oil, paint, sealers, etc.; chip off high spots. b. Mark the floor finish level on the wall from the benchmark line. Except for bathrooms, use the same level for the entire floor. c. Laying the screed: - Brush a cement slurry (water/cement ratio 0.4–0.5) on the concrete, keeping the area small and working as you go. - Spread leveling mortar so that when the panel is placed it is 3–4mm above the finish line. Mortar: ordinary Portland cement ≥32.5, medium or coarse sand with silt content <3% and no organic matter; ratio 1:2, mixed with water to a state that “forms a ball when squeezed, crumbles when dropped”. Screed and compact. d. Snap cross lines, dry‑lay panels on the mortar, tamp firmly; check colour, size, and edge flatness; swap panels if necessary. e. Apply adhesive: - Prepare the one‑component moisture‑curing polyurethane adhesive as instructed. - Lift the panel, add a small amount of adhesive to the four corners on the mortar. Clean the back of the panel, then apply adhesive with a 6mm×6mm notched trowel, 2–3mm thick. Fill edges/corners and bevel. f. Carefully place the panel, press, tamp and level gently; avoid rough impact. g. Provide joints and movement joints as above. h. Hollow check every 30m²; re‑lay if hollow found. i. Grouting after 28 days, same as above. IV. After installation, immediately cover with a breathable protective layer (gypsum board, fibreboard, hardboard, or plywood) to prevent scratching, soiling, and vibration. No foot traffic for 3 days; no goods moving, ladder placement, or heavy equipment traffic for 7 days.