Artistic Mosaic

Reference Price:USD/㎡
Brand:CAI HUA
Material No.:H45XPWMI
Supplier: CONTACT USCONTACT US
Material ID:
Add to Project
Material Consultation
Overview
Product Reports
Documents
Specifications
Product Model:BHTH06206
Color:
Green Series
Flammability:A1
Content:Ceramic
Construction:Ceramic Glazed Surface
Overall Thickness:5
Surface Sheen:Glossy
Size(mm):Chip 20*145 Sheet 296*299
Brand Name:CAI HUA
Series Name:Autumn Tales
Category:Special Finish/Mosaic
Customizable:Yes
Overview
Structural Diagram
Structural Diagram
Case Diagram
Case DiagramMaterial Image

Details

Attention

1. Check materials before installation

Before starting, carefully inspect the packaging boxes for the multicolored mosaic tiles to ensure you have enough to complete the work. Each box displays the product model, color number, production batch number, and other detailed information.

2. Smooth the wall base

This step involves leveling the wall base. After leveling, the wall must be smooth and of uniform color.

3. Mark guidelines

Draw lines on the wall to mark the exact position of each mosaic sheet. Lay 3 mosaic sheets side by side on the floor, making sure the gaps between sheets match the grout joints within a single sheet. Measure the overall width, then use a ruler and level to draw the measured dimensions vertically and horizontally on the wall to form a large grid. Then divide the large grid into 9 smaller squares, each intended for one mosaic sheet.

4. Prepare tile adhesive

Prepare the tile adhesive mixed according to the specified ratio. Spread the adhesive with a trowel, but only over an area no larger than the 9-sheet grid. First, smooth the adhesive with the flat edge of the trowel, then use the notched edge to create an even layer of serrated ridges. Now the mosaics are ready to be installed on the wall.

5. Lay and fix the mosaics

Because the mosaics are mesh-backed, they can be applied directly onto the adhesive-coated wall surface. Place the mosaics vertically. Note: The gaps between sheets must be consistent with the grout joints within each sheet.

6. Consolidate

After positioning each sheet, gently tap the mosaic surface with a grout float to firmly secure it to the wall.

7. Ensure consistent grout joints

After all sheets are fixed and before applying grout, the gaps between tiles must be a uniform width. Use a small trowel to adjust the joints as needed. This is the step requiring the most patience during mosaic installation, but it is the most crucial part of the process.

8. Grouting

Prepare the required grout mixture. Using a small grout float, take a small amount of mixed grout each time and spread it evenly over the mosaic surface. Move the float diagonally, first from bottom to top and then from top to bottom, ensuring all joints are completely filled without excess residue.

9. Cleaning

Before the grout dries, start cleaning the mosaic surface. Prepare two buckets—one with a cleaning solution and one with clean water. First, dampen a cloth in the cleaning solution bucket without wringing it out, then wipe the mosaic surface in a circular motion. Next, soak a sponge in the clean water bucket and wipe the surface to remove all residue. Finally, wipe the surface again with the sponge until completely clean.