
Shadow Mold-Resistant Artistic Coating
.jpg?x-oss-process=image/resize,w_900,m_lfit)

Details







Attention
I. Post-Application Curing
Drying and Ventilation: After application, allow to ventilate and dry for at least 7 days. Avoid bumps and scratches to ensure the coating is completely dry.
Avoid Contamination: Do not touch, rub, or use cleaning agents within 48 hours to prevent coating damage.
II. Daily Cleaning and Maintenance
Cleaning Method: Gently wipe with clean water or a neutral detergent. Avoid strong acids, alkalis, or abrasive cleaners. Do not use hard objects to scrape or strong chemical solvents to prevent coating damage.
Scratch Repair: Minor scratches can be sanded lightly with fine sandpaper and then wiped. For severe damage, re-application is needed. Ensure the coating is completely dry before repairing.
III. Substrate Preparation Before Application
Wall Requirements: The substrate must be clean, dry, free of oil and loose substances. The putty layer should be free of cracks and bulges. For cement walls, level with putty.
IV. Application Condition Control
Environmental Requirements:
Temperature: 5°C – 35°C. Avoid low temperatures causing slow film formation or high temperatures leading to water loss and cracking.
Humidity: ≤85%. In high humidity, extend the drying time (if humidity exceeds 80%, ventilate until it is ≤80%).
V. Application in Special Environments
1. Low/High Temperature Protection
Low Temperature (>5°C): Surface dry time 4-6 hours, hard dry time 24 hours, curing requires 7-10 days.
High Temperature (<30°C): Surface dry time shortened to 2 hours, hard dry time 12 hours, but pay attention to the risk of coating water loss.
2. High Humidity Response
When humidity >80%, drying time is extended to 4-6 hours, curing requires 7-10 days.
