Teak Engineered Flooring

Reference Price:USD/㎡
Brand:ARK
Material No.:M8A28Y44
Supplier: CONTACT USCONTACT US
Material ID:
Add to Project
Material Consultation
Overview
Product Reports
Documents
Specifications
Product Model:Trinidad CTS-5103
Country of Origin:Shanghai, China
Flammability:B1
Color:
Brown Series
Overall Thickness(mm):19
Pattern:Cathedral Grain,Hand-scraped Wave Pattern,Straight grain
Indoor & Outdoor:Indoor
Size(mm):3000*300
Wood Species:Teak
Surface Treatment:Semi-matte,Wear-resistant
Brand Name:ARK
Series Name:Modern Avenue
Category:Flooring/Wood Flooring/Engineered Wood Flooring
Customizable:Yes
Material Spelling
Overview
Case Diagram
Case Diagram

Attention

After installation, the floor must be conditioned for at least 24 hours before use; otherwise, performance may be affected. In general, wood flooring has limited water resistance. Do not clean with wet cloths or water, as this may cause loss of lustre. For daily care, follow these guidelines:

1. Maintain ambient humidity between 55% and 65%. Rooms (non-wet areas) should not be excessively humid; aim for 55%–60% relative humidity, including interior spaces and dry zones of bathrooms.

2. Keep floors dry and clean in everyday use. Remove dust and grit with a vacuum cleaner first, then wipe with a damp (not dripping) cotton mop. For stubborn stains, use a neutral cleaning solution, then wipe with a well-wrung cotton mop. Never use acidic or alkaline solvents, gasoline, or other organic solvents.

3. Avoid scratching the floor with sharp metal objects, glass fragments, shoe studs, or other hard items. Do not expose the floor to open flames or place high-wattage heaters directly on its surface. Do not put strong acid or alkali substances on the floor.

4. Prevent prolonged exposure to intense sunlight; use sheer curtains to filter direct light. Sudden temperature fluctuations may cause premature ageing of the floor surface and should be avoided.

5. When moving furniture, lift and place it gently; never drag items across the floor. For frequently moved pieces, attach protective rubber pads to the bottom.

6. In the event of large-area water immersion or prolonged local soaking, immediately shut off the water supply at the main valve. Remove standing water with dry cloths and allow the floor to dry naturally. Do not use electric heaters or expose the floor to direct sunlight for accelerated drying. Monitor the floor surface: if discolouration such as blackening, reddening, or greening occurs, this indicates mould growth has started. The flooring should be promptly removed, and the subfloor aired for at least 30 days. Reinstall only after instrumental measurements confirm the subfloor moisture content meets the requirements for reinstallation.