Striated Travertine



Attention
Engineered Stone Flooring Installation
I. General Requirements for Engineered Stone Flooring Installation:
1. Engineered stone tiles should be laid from the inside out, starting from the side farthest from the door and working back toward the door.
2. The engineered stone border and baseboards should align with the floor tile joints where possible.
3. Protection from rain and water accumulation near doors and windows is required; water, electricity, tools, and safety measures must be in place.
II. Thin-Bed (Hard Base) Method Installation Requirements:
1. Installation must be on a fully cured, solid substrate. Concrete slab must cure for at least 28 days and cement mortar screed for at least 14 days before installation.
2. Use a two-component cement-based adhesive as bonding material.
3. The solid substrate must meet the following requirements:
1) Substrate flatness deviation ≤ 3mm over 2m. If not met, treat with polymer-modified cement mortar.
2) No standing water on the work surface; substrate moisture content preferably ≤ 8%.
3) Substrate surface must be sound, clean, and free of grease, paint, dust, and other contaminants affecting bond.
4) Substrate strength must meet:
① Concrete slab strength grade ≥ C20;
② Screed mortar strength grade ≥ M15, screed thickness preferably ≥ 20mm, cement-sand ratio approx. 1:2.
4. The installation process flow should follow the diagram below:
5. Key installation steps:
1) Roughen (key) the substrate surface.
2) Snap crossed control lines on the substrate according to the shop drawings and extend lines up the wall base.
3) Prepare the adhesive following the manufacturer’s instructions, mix thoroughly, and only prepare as much as can be used within its pot life according to installation speed.
4) On the substrate, apply a flat layer of the two-component cement adhesive with the straight edge of a 10mm x 10mm notched trowel, then comb with the notched side to create continuous, fully formed ridges. Hold the trowel at a 45° angle, keeping adhesive thickness 3mm~4mm.
5) Clean the back of the engineered stone slab with a dry cloth or brush to remove loose dust, grease, rust, etc. On the slab back, apply a flat coat of adhesive with the straight edge of a 12mm x 12mm notched trowel, then comb ridges with the notched side at a 45° angle, adhesive thickness 3mm~4mm. Fully butter the slab edges and corners and bevel the adhesive.
6) Place the prepared slab carefully onto the substrate. The ridge direction on the back of the slab must be parallel to the ridges on the substrate, bonding ridge-to-groove. After positioning, press and rub the slab firmly and adjust for level.
7) Leave required joints between tiles as designed; use spacer clips to maintain consistent joints. Also provide expansion/movement joints as per design, cutting through to the substrate.
8) Every 30m² of installation, gently tap each tile to check for hollow sound (drumminess). If any hollow sound appears, the tile must be re-laid immediately.
9) Grouting preferably 28 days after installation or once adhesive is fully cured and dry. Grouting requirements:
① Clean joints thoroughly, then fill with a reactive resin grout matching the stone colour. Grout must be uniform, full, and bond firmly.
② Clean movement joints down to the substrate. Before floor treatment work, fill with a neutral-cure silicone sealant. After floor treatment, fill with a buffer such as a U‑channel.
III. Thick-Bed (Soft Base) Method Installation Requirements:
1. After on-site mortar screed levelling, install using a one-component moisture-cure polyurethane adhesive following the process flow diagram below:

2. Key installation steps:
1) Remove laitance, splashes, oil, paint, sealers, and any bond-inhibiting contaminants from the concrete slab; chip off high spots.
2) Mark the finished floor level on the wall based on a datum. Except for wet rooms, the same level should be used for the entire floor on one storey.
3) Place the screed as follows:
① Apply a neat cement slurry (water-cement ratio 0.4~0.5) on the concrete slab; only apply as much as can be covered immediately with mortar.
② Spread the levelling mortar so that when the stone slab is placed it sits about 3mm~4mm above the finished floor line. Use ordinary Portland cement ≥32.5 grade. Sand should be medium or coarse, silt content <3%, free from organic matter. Cement-sand ratio approx. 1:2, mixed with water to a "shapeable when squeezed but crumbles when tapped" consistency. Screed with a straightedge and compact with a trowel.
4) Snap crossed control lines. Dry-lay the stone slabs on the mortar bed, press and vibrate them firmly; check colour, size, edge flatness and replace any unsuitable pieces.
5) Apply adhesive:
① Prepare the one-component moisture-cure PU adhesive according to instructions.
② Lift the dry-laid slab. Place small dabs of adhesive at each corner on the mortar bed. Clean the slab back with a dry cloth or brush, then comb adhesive with a 6mm x 6mm notched trowel, thickness 2mm~3mm. Fully butter edges and corners and bevel the adhesive.
6) Carefully set the slab onto the screed, press, tap firmly and level. Do not hammer roughly.
7) Maintain designed joint widths between tiles; use spacer clips. Install movement joints as designed, cut through to the substrate.
8) Every 30m², gently tap each piece to check for hollow spots. Re-lay any if found.
9) Grout preferably 28 days after installation or once adhesive is cured dry. Grouting requirements:
① Clean joints and fill with colour-matched reactive resin grout, full and firmly bonded.
② Clean movement joints to substrate. Before floor treatment, fill with neutral-cure silicone; after treatment, fill with a buffer such as a U‑channel.
IV. After floor installation is complete, continuously cover with a breathable protective layer such as gypsum board, fibreboard, hardboard, or plywood to prevent scratches, soiling, and vibration during subsequent work. No foot traffic for 3 days after installation. No moving of goods, ladders, or heavy equipment for 7 days.