Snow White

Reference Price:USD/㎡
Brand:YUE HENG DA
Material No.:RKW6U0AC
Supplier: CONTACT USCONTACT US
Material ID:
Add to Project
Material Consultation
Overview
Product Reports
Documents
Specifications
Product Model:BD7132-1
Country of Origin:Guangdong Province, China
Hardness Factor:4
Finish:Matte,Polished,Acid-washed Finish,Litchi Finish,Hammered Finish,Natural Finish,Customizable
Fire Rating:A1
Pattern:No pattern
Indoor & Outdoor:Indoor Wall,Outdoor Wall,Outdoor Floor,Indoor Dry Area,Indoor Wet Area,Countertop
Overall Thickness:18,20,Customizable
Water Absorption:0.29
Size(mm):2430*1630、2430*1830、2730*1830、3030*1630、3230*1630
Organic/Inorganic:Inorganic
Color:
Cyan Series
Brand Name:YUE HENG DA
Series Name:Inorganic Terrazzo
Category:Stone/Engineered Stone/Terrazzo
Customizable:Yes
Overview
Case Diagram
Case DiagramMaterial ImageMaterial Image

Attention

Engineered Stone Flooring Installation I. General requirements for engineered stone flooring installation: 1. Engineered stone flooring should be laid in an inside-to-outside sequence, starting from the side farthest from the doorway and working back toward the door. 2. Skirtings and border tiles should be aligned with floor tiles. 3. Ensure rain protection and water drainage prevention around doors and windows; necessary water, electricity, tools, and safety measures must be in place. II. Thin-bed method on rigid substrate: 1. Installation must be on a fully cured, rigid substrate. Concrete screeds require at least 28 days of curing, and cement mortar beds require at least 14 days before tiling. 2. Use a two-component cement-based adhesive. 3. The rigid substrate must meet the following: a) Flatness deviation ≤ 3 mm per 2 m. If not achieved, level with polymer-modified cement mortar. b) No standing water; substrate moisture content should generally not exceed 8%. c) The surface must be sound, clean, and free from grease, paint, dust, or other bond-breaking contaminants. d) Substrate strength: - Concrete screed grade ≥ C20. - Levelling mortar grade ≥ M15, thickness ≥ 20 mm, cement-sand ratio approximately 1:2. 4. Follow the established installation workflow: 5. Key installation steps: 1) Mechanically roughen the substrate surface. 2) Snap chalk reference lines according to the layout plan and transfer them to the wall base. 3) Mix the two-component cement adhesive following the manufacturer's instructions; mix only as much as can be used within the open time. 4) Spread the adhesive on the substrate using the flat side of a 10 mm × 10 mm notched trowel, then comb with the notched side held at a 45° angle to form continuous, unbroken ridges. Thickness should be 3–4 mm. 5) Clean the back of each engineered stone tile with a dry cloth or brush to remove dust, grease, rust, etc. Apply adhesive with the flat side of a 12 mm × 12 mm notched trowel, then comb with the notched side at 45°. Thickness 3–4 mm; ensure corners are filled and chamfered. 6) Place the tile carefully so that the ridge direction on the back parallels that on the substrate, with valleys mating with peaks. Press firmly and adjust for level. 7) Maintain required grout joints between tiles, using spacers if needed. Provide movement joints as specified, extending through the tile layer to the substrate. 8) Check for hollow spots every 30 m² by light tapping. Re-lay any hollow-sounding tiles immediately. 9) Grouting is best done 28 days after installation or once the adhesive is fully cured. a) Clean joints and fill with a reactive resin grout matching the engineered stone color, ensuring uniform, full application and strong adhesion. b) Clean movement joints down to the substrate, fill with neutral-cure weatherproof silicone sealant before surface treatment, and install a U-channel or similar buffer after treatment. III. Thick-bed method: 1. After installing the levelling mortar on site, use a one-component moisture-curing polyurethane adhesive following the workflow below: 2. Key installation steps: 1) Clean the concrete screed: remove laitance, loose mortar, oil, paint, sealers, and protrusions. 2) Mark floor level lines on walls based on a benchmark; except in wet rooms, use the same level for the entire floor. 3) Placing the levelling bed: a) Brush the concrete screed with a neat cement slurry (water-cement ratio 0.4–0.5) immediately before spreading mortar. b) Spread the mortar to a thickness so that the tile, when placed, sits about 3–4 mm above the finished floor line. Use ordinary Portland cement ≥ 32.5 strength, and medium or coarse sand with silt content < 3% and no organic impurities; cement-sand ratio ~1:2, mixed with water to a “shapeable but crumbles when bounced” consistency. Screed with a straightedge and tamp firmly. 4) Snap reference lines, dry-lay tiles on the levelling mortar, tamp and rub firmly. Check color, size, and edge flatness; swap tiles if necessary. 5) Apply adhesive: a) Prepare one-component moisture-curing polyurethane adhesive per instructions. b) Lift the trial-laid tile, apply a small amount of adhesive at the corners of the mortar bed. Clean the tile back and spread adhesive with a 6 mm × 6 mm notched trowel, thickness 2–3 mm; fill and chamfer corners. 6) Set the tile carefully onto the mortar bed, press and tamp firmly to level. Do not strike roughly. 7) Maintain joint widths and movement joints as specified, securing with spacers. 8) Check for hollowness every 30 m² and correct immediately. 9) Grouting follows the same procedure as the thin-bed method: fill joints with matching reactive resin grout and movement joints with neutral-cure weatherproof silicone sealant followed by U-channel buffer after surface treatment. IV. After installation, continuously protect the floor with breathable protective coverings such as gypsum boards, fiberboards, hardboard, or plywood to prevent scratches, staining, and vibration. Do not walk on the installation for 3 days; avoid moving goods, setting up ladders, or bringing in heavy equipment for 7 days.