
Self-Leveling Decorative Quartz










Details
Attention
1. Allow the surface to cure for 7 days after completion before putting it into use. Avoid water and chemical spills during curing.
2. Handle moving items with care; do not drag or slide objects to prevent scratches.
3. Keep coarse sand, gravel, mud, and other debris off the floor during daily use.
4. If the floor is exposed to chemical spills, wipe clean immediately with a cloth. For routine cleaning, use clean water or a mild detergent.
5. In areas prone to oil leakage at machinery edges, use sawdust regularly to absorb and clean up residues.
6. Minor wear or scratches can be repaired locally. For extensive damage, it is recommended to reapply the topcoat.
7. If possible, apply a coat of wax before use to protect the floor and extend its service life.
