Artistic Mosaic

Reference Price:USD/㎡
Brand:CAI HUA
Material No.:VGF1615M
Supplier: CONTACT USCONTACT US
Material ID:
Add to Project
Material Consultation
Overview
Product Reports
Documents
Specifications
Product Model:PHXCR82
Color:
Brown Series
Flammability:A1
Content:Ceramic
Construction:Antique Glazed Surface
Overall Thickness:5
Surface Sheen:Matte
Size(mm):Chip 23*23 Sheet 300*300
Brand Name:CAI HUA
Series Name:Golden Era
Category:Special Finish/Mosaic
Customizable:Yes
Overview
Case Diagram
Case Diagram

Details

Attention

This step involves levelling the wall base. After levelling, the wall must be smooth and uniform in colour.

3. Marking

Mark lines on the wall to record the exact position of each mosaic sheet. Lay out 3 mosaic sheets side by side on the floor, ensuring the joints between sheets match the joints within a single sheet. Measure the overall width, then use a straightedge and spirit level to draw a large grid on the wall based on the measured dimensions. Divide the large grid into 9 smaller squares, each to accommodate one mosaic sheet.

4. Preparing the tile adhesive

Prepare the tile adhesive according to the mixing ratio. Using a notched trowel, apply the adhesive to an area no larger than the space needed for 9 mosaic sheets. First, flatten the adhesive with the smooth edge of the trowel, then comb it with the notched edge to form an even ribbed layer. The mosaic sheets are now ready to be installed.

5. Installing and fixing

Since the mosaic sheets are mesh-backed, they can be applied directly onto the adhesive-coated wall. Place the sheets vertically. Caution: The gap between sheets must be consistent with the joints within each sheet.

6. Consolidation

After positioning each sheet, gently tap the surface with a grouting float to ensure firm adhesion to the wall.

7. Ensuring uniform joints

After all sheets are fixed and before applying grout, the gaps between sheets must be adjusted to a uniform width. This is done using a small trowel to fine-tune the joints. This step requires the most patience but is the most critical part of the mosaic installation process.

8. Grouting

Prepare the required grout. Using a grout float, take a small amount of mixed grout and spread it evenly over the mosaic surface, moving the float diagonally—first from bottom to top, then from top to bottom. Ensure all joints are completely filled without excess residue.

9. Cleaning

Before the grout dries, begin cleaning the mosaic surface. Prepare two buckets: one with a cleaning solution and one with clean water. First, dampen a cloth in the cleaning solution (do not wring out) and wipe the surface in a circular motion. Then, dampen a sponge in the clean water and wipe the mosaic to remove all residues. Finally, wipe the surface again with the sponge until clean.