
Microcement Artistic Coating
.jpg?x-oss-process=image/resize,w_900,m_lfit)



Details











Attention
1. Post-application Curing
Drying and ventilation: After application, allow to dry with ventilation for about 3 days. Avoid impacts, scratches, or abrasions to ensure the coating dries completely.
Prevent contamination: Do not touch, rub, or use cleaning agents within 48 hours to avoid damage to the coating.
2. Daily Use and Care
Cleaning and maintenance
Wipe with a damp cloth using a pH-neutral cleaner; avoid acidic, alkaline, or abrasive cleaners.
For oil stains, use a specialized stain remover, and always test on a small, inconspicuous area first.
Damage repair
Minor scratches can be sanded with fine-grit sandpaper then wiped clean. For severe damage, re-coating is required. Ensure the coating is completely dry before any repair work.
3. Substrate Preparation Before Application
Wall surface requirements
The substrate must be clean, dry, and free from oil, loose particles, and the plaster/putty layer must be free from cracks or blistering. Cement walls need to be leveled with putty.
4. Application Conditions
Environmental requirements
Temperature: 5°C–35°C. Avoid low temperatures that slow film formation or high temperatures that may cause rapid water loss and cracking.
Humidity: ≤85%. In high humidity conditions (above 80%), extend drying time and ventilate until humidity drops to ≤80%.
Drying time: Surface dry in 12 hours, thorough dry in 24 hours. Full curing takes 7–10 days, but be mindful of the risk of moisture loss from the coating.
