ABA Composite Click Lock Vinyl Flooring

Reference Price:USD/㎡
Brand:RIEE
Material No.:WDY2HMF1
Supplier: CONTACT USCONTACT US
Material ID:
Add to Project
Material Consultation
Overview
Product Reports
Documents
Specifications
Product Model:ST-2306
Country of Origin:Anhui Province, China
Overall Thickness(mm):6.0+1.5mm
Surface Treatment:Wear resistant surface
Size(mm):300*600/450*900
Color:Grey Series
Flammability:B1
Brand Name:RIEE
Series Name:Stone Texture Series
Category:Flooring/PVC Flooring
Customizable:Yes
Material Spelling
Overview
Case Diagram
Case DiagramMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial ImageMaterial Image

Details

The main materials of the product are polyvinyl chloride (PVC) and calcium carbonate (natural stone powder). The production process is as follows: 1 Mixing, mixing the raw materials through a large mixing machine;2 Extrusion, providing assembly line equipment to extrude the mixed product into a corresponding thickness of substrate;3 Steam hot pressing, a large steam hot press with a pressure of 500 tons, hot pressing the color film, the wear-resistant layer and the substrate together for 45 minutes;4 Health preservation, that is, letting the product stand for 24 hours to allow the product to come into contact with the air; 5 Tempering, soak the product in a hundred-meter-long cold water and hot water tank to make the product more stable in thermal expansion and contraction;6 Maintaining health, that is, let it stand for 24 hours to allow the product to come into contact with the air;7 Slotting, cutting into corresponding size, unlocking and locking;8 Testing, the laboratory test passed;9 Fitting and pasting a silent mat;10 Packaging;11 Warehouse.

Attention

1. First remove the dust and dirt on the surface of the locking floor. 2. Clean and remove maintenance wax, vegetable oil, dust and other stains on the surface of the lockdown floor, and use a water absorber to absorb the wastewater. 3. Wash it with cold water and suck it up. 4. If necessary, apply 1-2 coats of high-strength surface wax.